scope of work: workshop design of steel structure / structural analysis of joints
location: Oostrozebeke / Belgium
timeline: 2007 – 2008
Jakosta was awarded the contract for the design of the steel structure of this Bio-Power Plant building at the end of 2007. Foster Wheeler was the contractor and technology supplier.
11 storeys, over 45m high and 650 tons of steel.
Start of assembly. The next elements await their turn.
Beautifully prepared, ballasted building ground.
Model of the complete structure generated using Bocad 3D.